400-188-4899

旧楼加装电梯
your current location : home >> News >> Industry Information

News

4 subsidiaries

Sino German cooperation

200000 M ² Manufacturing base

China's first elevator industry skills training school


The construction sequence of installing elevators in old buildings

2020-06-17
times

电梯价格

1. The civil engineering of the elevator shaft shall be inspected to determine whether its position and size meet the civil layout and other requirements provided by the elevator manufacturer.

2. Set up protective railings for the reserved holes of the landing doors, and set up temporary cover plates for the reserved holes of the machine room leading to the hoistway.

3. Install guide rails after setting the reference line in the hoistway.

4. Equipment installation in the machine room, piping and wiring in the shaft.

5. Install landing doors and other related accessories after the car is assembled.

6. After passing the power-on and no-load test run, load test run, and check whether each safety device operates normally and accurately.

7. Organize various records and prepare to apply for approval.


label

Recently Viewed:

about
Company Profile
Company culture
Qualification honor
Team style
Factory Appearance
Development path
Company video
product
Passenger
Sightseeing
Freight
news
Industry Information
Entreprises news
Wonderful video
Company
Shandong Bolt Elevator Co., Ltd.
Dezhou Pengfei Escalator Parts Co., Ltd.
Shandong Mengzhi Art Elevator Technology Co., Ltd.
Ningjin Elevator School
contact us

Add: Bolt Industrial Park, Yinhe Economic Development Zone, Ningjin County, Shandong Province

Tel:0534-5421899 5224899

Fax:0534-5238819 Postcode:253400

E-mail: boltdt@vip.163.com

boltdt@bolt-elevator.com


博尔特电梯底部二维码1.jpg

Copyright © Shandong Bolt Elevator Co., Ltd. 1 service support:Jinan Xinqihua Information Technology Co., Ltd. Sitemap | RSS | XML Privacy PolicySitemap